TL;DR
Karis Samuelson Idowu and her husband, Jarvis, remodeled their bathroom after finding black mold and deciding they needed more room and light. They handled demolition themselves, reused the old shower glass and hired a specialist to finish and seal the Tadelakt plaster.
Karis Samuelson Idowu and her husband, Jarvis, turned a cramped bathroom they described as “strange” into a brighter space with a custom double sink and Moroccan-style plaster, in a renovation featured by Apartment Therapy. The couple said they began the project after finding black mold and realizing the layout blocked light and left too little room for both of them.
Get home appliances delivered free with Prime
- Fast, free delivery on millions of items
- Prime Video, Amazon Music and more included
- Member-only deals all year
The couple told Apartment Therapy they wanted a bathroom where two people could use the space at once. They also felt that a shower wall at the far end blocked light. Finding black mold added another reason to strip the room back and redo it, although the report does not specify where the mold was found or how extensive it was.
Karis and Jarvis did the demolition themselves, with help from their friend Martin on plumbing and electrical work. Karis described the teardown as “super fun and super messy” and said completing it in a weekend saved money. She reported that their first estimate for demolition and rubbish removal was $12,000, based on a projected five days of work by three or four workers. That was a quote, not the final cost of the renovation.
Removing the shower walls made the biggest immediate difference, Karis said, because the room felt “big and bright.” The couple kept the existing shower glass, built a new vanity and made a raised trough-style sink with two faucets to suit Jarvis, who is 6 feet 5 inches tall. Two organic-shaped mirrors, white lights and slender wall-mounted faucets complete the design.
The old bathroom combined stone tile on the main floor with pebble-style tile in the shower. The renovation replaced that look with a Tadelakt finish, a Moroccan-style plaster. Karis said the couple and their friends handled waterproofing and cement work, but she and Jarvis had trouble applying and sealing the plaster properly. They then brought in a specialist, identified as Gary in the report, to apply the remaining material and help make the finish waterproof.
A More Open Bathroom Layout
The project illustrates how a layout change, rather than new fixtures alone, can alter how a small bathroom feels. According to Karis, removing the shower walls opened the room to more light, while the custom sink addressed the couple’s need for two people to use the space. The finished design also replaced visibly different tile surfaces with one more consistent material treatment.
The renovation account includes a practical lesson for readers weighing a DIY bathroom project: the couple managed demolition themselves, but sought outside help with plumbing, electrical work and the final plaster sealing. Their experience suggests that saving on one part of a project does not mean every stage is suitable for first-time work. The report does not provide a full budget, so the $12,000 demolition estimate should not be read as the renovation’s total cost or as a confirmed saving.
Products Worth Considering

Ring Battery Doorbell Plus (2nd Gen) and Chime Plus Bundle, Nickel Silver and White

LEVOIT Vital 200S-P Smart Air Purifier for Large Rooms, White

eufy Security SoloCam S340 3K Dual-Lens Solar Security Camera
As an affiliate, we earn on qualifying purchases.
From Mixed Tile to Tadelakt
Apartment Therapy’s before-and-after feature presents the renovation as a response to several problems in the existing bathroom: a layout the couple found awkward, a wall they felt blocked light, mismatched floor and shower finishes, and the discovery of black mold. The article does not give a construction date, the home’s location, or measurements of the room.
The couple’s design centered on a plaster-like surface and a custom-built vanity rather than a standard store-bought sink arrangement. They reused the shower glass, while friends helped with portions of the work. Tadelakt was their chosen finish after waterproofing and cement work; when their own attempts at sealing it did not go as planned, they hired a specialist to complete that stage. The report does not describe the mold remediation or identify who assessed the affected area.
“We wanted more space so the both of us could be in the bathroom at the same time.”
— Karis Samuelson Idowu, as quoted by Apartment Therapy
Costs and Mold Details Missing
Apartment Therapy’s report does not state the project’s total cost, the amount the couple spent after doing the demolition themselves, or how much the specialist charged. The $12,000 figure is described as an initial quote for demolition and rubbish removal, not a confirmed bill or a full-project comparison.
Other details remain unreported, including the bathroom’s size and location, the extent of the black mold, how it was treated, and whether any inspection or permits were involved. The report also does not independently assess the renovation or verify the waterproofing; those details are based on the couple’s account.
No Further Work Announced
Apartment Therapy’s feature presents the bathroom as a completed renovation, and no additional work or follow-up milestone is announced in the report. Karis said she was pleased with the result, while noting that she would have hired the Tadelakt specialist from the start if she were doing the project again.
The account does not say whether the couple plans further renovations or whether they will publish additional project details. For readers considering similar work, the next steps would depend on the condition of their own bathroom and the requirements that apply to their home; this feature does not provide a project plan or a cost guide.
Key Questions
What changed in the bathroom renovation?
The couple removed shower walls to open up the room, built a custom raised sink with two faucets, reused the shower glass and replaced the mismatched tile look with Tadelakt plaster.
Why did Karis and Jarvis remodel the bathroom?
They wanted more room for two people to use the bathroom and felt a shower wall blocked light. Karis also said they found black mold, which gave them another reason to start over.
How much did the renovation cost?
The report does not give the final project cost. Karis said the couple’s first quote was $12,000 for demolition and rubbish removal; that figure was an estimate for that portion of the work, not the total renovation budget.
What is Tadelakt?
Tadelakt is a Moroccan-style plaster finish. Karis said the couple had difficulty sealing it correctly and hired a specialist to apply the remaining material and help waterproof the surface.
Did the couple do all the work themselves?
No. They handled demolition, but their friend Martin helped with plumbing and electrical work, friends assisted with waterproofing and cementing, and a specialist completed the Tadelakt finish. The report does not detail who handled mold remediation.
Source: apartmenttherapy.com